Featured Projects

  •  from Ardent Services | Electrical & Instrumentation Services |

    Leesville Cryogenic Processing Facility

    The Leesville Plant is a 200 MMSCFD cryogenic processing facility located in Leesville, Ohio. The peak manpower during the project was 91 employees and the project ...

    Read More...

  •  from Ardent Services | Electrical & Instrumentation Services |

    Grassroots Crude Oil Rail Car Unloading Facility

    Ardent provided electrical and instrumentation services for construction and start-up of this grassroots crude oil rail car unloading facility located in Taft, California with a capacity ...

    Read More...

  •  from Ardent Services | Electrical & Instrumentation Services |

    Midmar & Fasken Gas Plants

    Ardent was charged with supporting the delivery of two 60 million cu ft per day (MMcfd) grassroots gas processing and compression facilities located in a remote ...

    Read More...

  •  from Ardent Services | Electrical & Instrumentation Services |

    Tioga Plant Expansion

    Ardent provided E&I construction services for a portion of the plant expansion for a cryogenic natural gas plant. This cryogenic natural gas plant will be able ...

    Read More...

  •  from Ardent Services | Electrical & Instrumentation Services |

    Gulf of Mexico Panel Fabrication

    Ardent recently completed a large panel fabrication project for a major deep-water offshore oil and gas production facility in the Gulf of Mexico. This project included ...

    Read More...

Capital Projects

Ardent has the experience and technical skills to service capital projects panel fabrication. Our new panel shop facility allows Ardent to engage in projects of all sizes.

 

Ardent recently completed a large panel fabrication project for a major deep-water offshore oil and gas production facility in the Gulf of Mexico. This project included working with both the engineering contractor and the customer on the design and fabrication of thirty-one (31) MMS Test and Fusible Loop Charge control panels. The design included CAD drafting and project documentation. Ardent furnished all materials including overseeing and administering the fabrication of custom enclosures meeting UL Listing guidelines. The project took place over a two year engineering, fabrication and installation time frame. Ardent supplied all project management, CAD, shop management, and FAT for the project. The total project value exceeded $2 million.

 

Ardent also recently completed the fabrication of a Hydraulic Power Unit (HPU) and accumulator system for control of hydraulically operated Safety Shutdown Valves on a new pipeline platform in the Gulf of Mexico. This project also included the fabrication of three (3) 550 gallon chemical injection skids, platform junction boxes, and a pneumatic Fusible Loop charge system. The project included system design, CAD, material procurement, enclosure layout, fabrication, testing, and documentation.

 

F0614L-HPU-Panel-008.jpg

    8 Years & counting without a Lost Time Accident!