Project List

Midmar & Fasken Gas Plants

Description:

Ardent was charged with supporting the delivery of two 60 million cu ft per day (MMcfd) grassroots gas processing and compression facilities located in a remote area of west Texas. The gas processing and compression facilities were located north of Midland, Texas in the Permian Basin. Ardent was charged with completing all aspects of electrical and instrumentation (E&I) construction, check-out and pre-commissioning for the two gas separation facilities. Using critical path methodologies, the experienced Ardent construction management teams completed the projects with a combined total of over 150,000 man-hours and a peak of 164 craftsmen performing the work with zero recordable injuries and zero lost time accidents. The projects were commissioned in December 2013.

Red Hills

Description:

In 2012, Ardent completed all electrical and instrumentation construction and pre-commissioning efforts for a new-build 60MMSCFD gas plant near Jal, NM. This eight month project included installation of 96 sections of 480V electrical equipment, 24 sections of 5kV power distribution equipment, 8,000 linear feet of cable tray, 272,000 linear feet of power and control cable, 42,000 feet of conduit, termination of 156 5kV conductors and 23,512 600V conductors, 40,000 feet of grounding conductor, 26,700 feet of trenching, installation of 896 instruments, installation of 18,500 feet of heat trace cable and 7,500 feet of process tubing. Ardent peaked at 126 personnel on site. The scope included two site-built MCC/Control rooms, and a truck loading control and measurement building. The work was executed through the summer in southeastern New Mexico and was completed with no recordable injuries. A small Ardent crew remained within this facility following construction turnover, and now supports the facility owner with maintenance and small capital projects.

    8 Years & counting without a Lost Time Accident!