Project List

El Segundo Duct Bank

Description:

Ardent installed new VFD building in running unit. The project consisted of excavating up to existing sub-Station, core drilling through vaults, and installing new 4.16KV /480V conduit duct bank. The project was field designed by our site manager with final drawings approved and permitted through engineering. Our Craft safely executed this project during a highly critical unit turnaround.

    8 Years & counting without a Lost Time Accident!